MTJM PROJECTS
| Project Description | Project Name | Location | Owner | Customer | Year |
| Mechanical Work | Spray Booth Panting Shop | Jakarta | PT Durr System | PT Durr System | 2024 |
| PLTD Tarakan 9 MW | PLTD Tarakan 9 MW | Tarakan | PT PLN | PT PLN Nusa Daya | 2024 |
| Mechanical Work | Recycling Machine Ereme | Tangerang | PT Indorama Ventures Indonesia | PT Indorama Ventures Indonesia | 2023 |
| Piping Work Conveying | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Electrical Work | Install Boiler 2×6 TpH | Amurang – Sulut | PT Kelapa Jaya Lestari | PT Thermax International | 2023 |
| Mechanical & Electrical Work | Installation Genset 7×1250 kVA | Sumba – NTT | PT PLN Persero | PT Aggreko Indonesia | 2023 |
| Assembly & Erection Equipment & Machines IWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Electrical Work | Install Boiler 1×6 TpH | Karawang | PT Indorama Ventures | PT Thermax International | 2023 |
| Assembly & Erection Equipment RPET Machine Erema | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Piping Work for Conveying Line | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Piping Work | WWTP & MEE | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Assembly & Erection Equipment & Machines IWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Install Load Bank 14×400 kW | MIG Data Centre | Jakarta | MIG Data Centre | PT Karya Intertek Kencana | 2023 |
| Piping Work | Chiller & Genset Work | Batam – Kepri | PT McDermott | PT Aggreko Indonesia | 2022 |
| Civil Work | Mining Facility | Samarinda | PT Kutai Energi | PT Kutai Energi | 2022 |
| Steel Structure | Boiler 5 TpH | Mentaya | PT Thermax International | 2022 | |
| Steel Structure | Boiler 3 TpH | Jambi | PT Thermax International | 2022 | |
| Mechanical & Electrical Work | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International | 2022 |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Mechanical & Electrical Work | Dearator & Economizer | Bekasi – Jawa Barat | PT Deheus | PT Thermax International | 2022 |
| Storage Tank | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International | 2022 |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Chimney | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Mechanical & Electrical Work | Installation Genset 5×1250 kVA | Jakarta | Formula E | PT Aggreko Indonesia | 2022 |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Cikande | PT Rich Cikande | PT Thermax International | 2022 |
| Relocation Transformer | Relocation Transformer 100 MVA | PLTU Kupang | PT KarPowership | PT Bertling | 2022 |
| Fire Fighting & Fire Alarm | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2022 |
| Electrical & Instrument Work | Project Gas Compressor | Denpasar – Bali | PT. PLN Persero | PT Grigora | 2022 |
| Reverse Osmosis | Water Treatment Work | Tangerang | PT Kobe | PT Thermax International | 2021 |
| Mechanical & Electrical Work | Chiller & Genset Work | Cibitung – Jawa Barat | PT XL | PT Aggreko Indonesia | 2021 |
| Civil & Architecture | Perbaikan Gudang | Cakung | PT Aggreko Indonesia | PT Aggreko Indonesia | 2021 |
| Civil & Architecture | Perbaikan Hotel | Jakarta | Hotel Sahid Jaya | Hotel Sahid Jaya | 2021 |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Solo | PT Muthu Gading | PT Thermax International | 2021 |
| Mechanical & Electrical Work | Install Boiler 1 TpH | Jombang | PT CPI | PT Thermax International | 2021 |
| Piping Work | Gas Turbine & Boiler | Serpong – Banten | PT Indorama Ventures | PT EuroAsiatic | 2020 |
| Piping Work | Boiler KAP 10TS | Cilengsi – Banten | PT Indorama Ventures | PT EuroAsiatic | 2020 |
| Mechanical & Electrical Work | PLTD Dobo 3 MW | Dobo – Maluku | PT PLN Persero | PT Aggreko Indonesia | 2020 |
| Mechanical & Electrical Work | PLTD Saumlaki 2 MW | Saumlaki – Maluku | PT PLN Persero | PT Aggreko Indonesia | 2020 |
| Repair Chiller | HVAC Work | Jakarta | Cyber Building 2 | Cyber Building 2 | 2020 |
| Installation HDPE Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Installation Fuel Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Rolling & Jacking Engine | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Fabrication Fuel Tank 5X20 KL | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Mechanical Work | PLTD Kaimana | Kaimana – Papua | PT PLN Persero | PT Aggreko International | 2019 |
| Mechanical, Civil & Electrical | PLTD Timika 5 MW | Timika – Papua | PT PLN Persero | PT Aggreko Indonesia | 2019 |
| Relocation Gas Engine | PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya | 2019 |
| Mechanical, Civil & Electrical | Installation Gas Engine 2×1000 kVA | Kampar – Riau | PT Pertamina Hulu Energi | KSO Sewatama – MAP | 2019 |
| Mechanical, Civil & Electrical | Installation Genset 1×400 kV | Daan Mogot – Jakarta | PT Perusahaan Gas Negara | PT Sumberdaya Sewatama | 2019 |
| Mechanical & Electrical Work | Perbaikan Hidran | Cibitung – Jawa Barat | PT KDS Indonesia | PT KDS Indonesia | 2019 |
| Installation HDPE Pipe | PLTU 2X1000 Kalteng | Kalteng | PT DSSP | Dongfang Electric | 2019 |
| Mechanical & Electrical Work | Installation Boiler PT CNG | Cibitung – Jawa Barat | PT CNG | PT Thermax International | 2019 |
| Container Modification | PLTD Pertamina Sembakung | Kalimantan Barat | PT Pertamina | PT Aggreko – KBT | 2019 |
| Mechanical & Electrical Work | Installation Water Treatment Plant 15 LPS | Cilacap | PT Dharma Usaha Sukses | PT Thermax International | 2019 |
| Electrical Work | Replacement Cable MV & LV Panel | Cilegon | PT Barata Indonesia | PT Barata Indonesia | 2018 |
| Dismantle Gas Engine | Dismantle Gas Engine MWM 14×1,7 MW | Rawa Minyak – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama | 2018 |
| Mechanical & Electrical Work | PLTMG Gasib Gas Engine MWM 14×1,7 MW | Gasib – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama | 2018 |
| Electrical Work | Dismantle & Installation Cubicle | Jakarta | Pertamina Simprug | PT Sumberdaya Sewatama | 2018 |
| Piping – Storage Tank – Electrical | WATER Storage Tank CAP 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata – Pipvalcon | 2018 |
| Instrument Work | WATER Storage Tank Cap. 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata Indonesia | 2018 |
| Piping HDPE Work | Water Treatment Work | PLTU Labuan | PLTU Labuan | PT Pipvalcon | 2018 |
| Civil & Architecture | Renovation | Bekasi | HKBP | HKBP | 2018 |
| Trainee & Certification | WPS & PQR Splicing Works | PLTU Tanjung Jati | PT BAM Decorient Indonesia | PT BAM Decorient Indonesia | 2018 |
| Dismantle & Install | Gas Engine PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya | 2018 |
| Mechanical & Electrical Work | Boiler KAP 3 TS – Muthu Gading | Solo | PT Muthu Gading | PT Thermax International | 2018 |
| Mechanical & Electrical Work | PLTD Nanga Tayap 6 MW | Kalimantan Barat | PT PLN Persero | PT Aggreko – KBT | 2018 |
| Electrical Work | Cleaning Panel – Pertamina Pusat | Jakarta Pusat | PT Pertamina Persero | PT Sumberdaya Sewatama | 2018 |
| Piping Work | WTP Tegal Gede | Cikarang – Jawa Barat | PT Moya | PT Eswareco Tama | 2017 |
| EPC Civil – Mechanical – Electrical | PLTMG 6.6 MW | LIRIK – Riau | PT PLN Batam | PT MaxPower Indonesia | 2017 |
| Dismantle Gas Engine | Dismantle Gas Engine | Batam – Kepri | PT Tunas Energy | PT MaxPower Indonesia | 2017 |
| EPC Civil – Mechanical – Electrical | Instalasi Genset 1×1250 kVA | Jakarta Selatan | Citi Bank | PT Global Energitama | 2017 |
| Mechanical – Electrical Work | Instalasi Genset 1×250 kVA | Sentul – Bogor | STIE Tazkiak | PT Global Energitama | 2017 |
| Mechanical – Electrical Work Instalasi | Genset 1×500 kVA | Palangkaraya – Kalteng | PT Bisma Darma Kencana | PT Global Energitama | 2017 |
| Piping Cooling System | PLTU 2X15 MW | Palangkaraya – Kalteng | PT Pusaka Jaya International | PT Pipvalcon | 2017 |
| Mechanical – Electrical Work | Repair Genset 25 kVA | SPBU Shell – Bandung | SPBU Shell – Bandung | PT Sumberdaya Sewatama | 2017 |
| Electrical Work | Replacement Cable MV | Jakarta | Pertamina – Pulo Gadung | PT Sumberdaya Sewatama | 2017 |
| EPC Mechanical – Electrical – Civil | Instalasi Steel Furnace Cap. 3 Ton | Toyota Sunter – Jakarta | Toyota Motor Manufacturing – Sunter | PT Inductotherm | 2017 |
| Electrical Work | Shutdown & Turn On Furnace | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm | 2017 |
| Dismantle Gas Engine | Dismantle Gas Engine 4xGE 620, 3.3 MW | Langgam – Riau | PT Langgam Power | PT MaxPower Indonesia | 2017 |
| EPC Mechanical – Electrical | Steel FurnaceS Cap. 3 TS | Sunter – Jakut | PT Toyota Manufacturing | PT Inductotherm Indonesia | 2016 |
| EPC Mechanical – Electrical | Steel FurnaceS Cap. 300 KG | Batam – Kepri | PT Optimex – Batam | PT Inductotherm Indonesia | 2016 |
| EPC Steel Structure | Racking Warehouse – Sunter | Sunter – Jakut | PT Navigat Energy | PT Navigat Energy | 2016 |
| EPC Mechanical – Electrical | Repair SPBU Shell – Fatmawati | Fatmawati – Jakbar | SPBU Shell Fatmawati | PT Sumberdaya Sewatama | 2016 |
| Electrical Work | Installation Trafo & Cubicle | Jakarta | Pertamina – Simprug | PT Sumberdaya Sewatama | 2016 |
| Steel Structure | RPTRA Pondok Kopi 1 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Steel Structure | RPTRA Pondok Kelapa | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Steel Structure RPTRA | Pondok Kopi 2 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Mechanical – Electrical Work | Factory Renovation | Malang | Bentoel Group | PT CKD/PT Mitra | 2016 |
| Electrical Work | Apartemen Regatta | Pluit – Jakut | Regatta | PT Jaya Teknik Indonesia | 2016 |
| EPC Mechanical – Electrical | PLTMG 11 MW – Dompak-Bintan | Bintan – Kepri | PT PLN Batam | PT Navigat Energy/PT MaxPower | 2015 |
| STP 30 M3 Pasar Cianjur | Proyek Pasar Cianjur – Bogor | Bogor – Jawa Barat | Pemkab Bogor | Pemkab Bogor | 2015 |
| Electrical Work | Instalasi Diesel Engine – Lebak | Lebak – Banten | PT Chemindo | PT Sewatama | 2015 |
| Piping | Cooler Diameter 60 Inchi PLTU Palu 2×18 MW | Palu – Sulteng | PT Pusaka Jaya International | PT Pipvalcon | 2015 |
| EPC Mechanical – Electrical | PLTMG 6,6 MW – Teluk Lamong-Surabaya | Gresik – Jawa Timur | PT Legi | PT Navigat Energy/PT MaxPower | 2015 |
| Steel Structure | Perumahan Kemang Bangka | Kemang – Jaksel | PT Utama Jaya Tehnik | PT Utama Jaya Tehnik | 2015 |
| HVAC Work | Shutdown AHU HVAC Building | Jakarta Pusat | KPP Propinsi DKI Jakarta | PT Thermocool Indonesia | 2015 |
| Electrical Work | PLTMG 15 MW – DURI | Duri – Riau | PT PLN Riau/PT MaxPower | PT Navigat Energy/PT MaxPower | 2014 |
| EPC Mechanical – Electrical | PLTMG 11 MW – Tarakan- Kaltara | Tarakan- Kaltara | PT PLN Tarakan/PT MaxPower | PT Navigat Energy/PT MaxPower | 2014 |
| Pipe HDPE Installation Dia. 18 | WTP Cap. 20 LPS – Perum Guna Land Bekasi | Bekasi – Jawa Barat | PT Guna Land | PT Guna Land | 2014 |
| WTP Citra Gran – Cibubur | WTP Citra Gran | Bogor – Jawa Barat | Perum Citra Gran – Cibubur | PT Parindo | 2013 |
| TankI Filter ST. Morits – Jakbar | WTP ST. Morits – Kembangan | Kebon Jeruk – Jakarta Barat | PT Tata | PT Eswareco Tama | 2013 |
| Instalasi TankI & Perbaikan Pipa | Pengembangan Instalasi Air Gedung | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan | 2013 |
| FUME HOOD Installation | Steel FurnaceS Modification | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia | 2013 |
| Plumbing Works | Apartemen Pulo Mas | Jakarta Timur | PT Duta Anggada | PT Nusa Raya Cipta | 2013 |
| EPC Mechanical – Electrical | Bio Gas Power Plant 1 MW – Asian Agri | UKUI – Riau | PT Asian Agri | PT Navigat Energy/PT MaxPower | 2013 |
| WTP Jungle Land – Sentul | WTP Jungle Land KAP. 25 LPS | Bogor – Jawa Barat | PT Jungle Land Asia | PT Adhi Karya | 2012 |
| Mechanical – Electrical | Steel FurnaceS Cap. 5 Ts/day | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia | 2012 |
| Hydrant & Electrical Factory | Factory Renovation | Cikarang – Jawa Barat | PT MITSUBISHI Electric | PT Zafitech | 2012 |
| Steel Structure | Rumah Dinas PLN PD Indah | Pondok Indah – Jakarta Selatan | PT PLN Persero | PT Swasti | 2012 |
| WELDING Pipe Cooler Dia. 32 In | Bukit Asam | Cileungsi – Jawa Barat | PT Bukit Asam | PT Karya Maju | 2012 |
| Electrical & Mechanical Work | Building Renovation | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan | 2012 |
| Rehabilitasi Gedung Kantor | Building Renovation | Tj Priok – Jakarta Utara | KPP Pratama Tj Priok | KPP Pratama Tj Priok | 2012 |
| Reservoar FRP Cap. 200 M3 | WTP Jungle Land KAP. 25 LPS | Bogor – Jawa Barat | PT Sumber Tirta | PT Sumber Tirta | 2012 |
| Piping LPG & Hydrant SPBE Jatiranggon | SPBE Jatiranggon Cap. 50Ts/Day | Bekasi – Jawa Barat | PT Indika Energy Tbk. | PT Hans Jaya Utama | 2011 |
| Cirebon CFPP 660MW Plumbing Works | PLTU Cirebon 66O MW – Plumbing Works | Cirebon – Jawa Barat | PT Cirebon Electric Power | PT Hans Jaya Utama | 2011 |
| Project IPA Kalimantan Barat | WTP Project Cap. 10 LPS | Singkawang – Kalimantan Barat | Kementerian Pekerjaan Umum | PT Artha Envirotama | 2011 |
| Project Description | Project Name | Location | Owner | Customer |
| Piping LPG & Hydrant SPBE Jatiranggon | SPBE Jatiranggon Cap. 50Ts/Day | Bekasi – Jawa Barat | PT Indika Energy Tbk. | PT Hans Jaya Utama |
| Cirebon CFPP 660MW Plumbing Works | PLTU Cirebon 66O MW – Plumbing Works | Cirebon – Jawa Barat | PT Cirebon Electric Power | PT Hans Jaya Utama |
| Project IPA Kalimantan Barat | WTP Project Cap. 10 LPS | Singkawang – Kalimantan Barat | Kementerian Pekerjaan Umum | PT Artha Envirotama |
| Project Description | Project Name | Location | Owner | Customer |
| WTP Jungle Land – Sentul | WTP Jungle Land KAP. 25 LPS | Bogor – Jawa Barat | PT Jungle Land Asia | PT Adhi Karya |
| Mechanical – Electrical | Steel FurnaceS Cap. 5 Ts/day | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia |
| Hydrant & Electrical Factory | Factory Renovation | Cikarang – Jawa Barat | PT MITSUBISHI Electric | PT Zafitech |
| Steel Structure | Rumah Dinas PLN Pd. Indah | Pondok Indah – Jakarta Selatan | PT PLN Persero | PT Swasti |
| Welding Pipe Cooler Dia. 32 In | Bukit Asam | Cileungsi – Jawa Barat | PT Bukit Asam | PT Karya Maju |
| Electrical & Mechanical Work | Building Renovation | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan |
| Rehabilitasi Gedung Kantor | Building Renovation | Tj Priok – Jakarta Utara | KPP Pratama Tj Priok | KPP Pratama Tj Priok |
| Reservoar FRP Cap. 200 M3 | WTP Jungle Land KAP. 25 LPS | Bogor – Jawa Barat | PT Sumber Tirta | PT Sumber Tirta |
| Project Description | Project Name | Location | Owner | Customer |
| WTP Citra Gran – Cibubur | WTP Citra Gran | Bogor – Jawa Barat | Perum Citra Gran – Cibubur | PT Parindo |
| TankI Filter ST. Morits – Jakbar | WTP ST. Morits – Kembangan | Kebon Jeruk – Jakarta Barat | PT Tata | PT Eswareco Tama |
| Instalasi TankI & Perbaikan Pipa | Pengembangan Instalasi Air Gedung | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan |
| Fume Hood Installation | Steel FurnaceS Modification | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia |
| Plumbing Works | Apartemen Pulo Mas | Jakarta Timur | PT Duta Anggada | PT Nusa Raya Cipta |
| EPC Mechanical – Electrical | Bio Gas Power Plant 1 MW – Asian Agri | UKUI – Riau | PT Asian Agri | PT Navigat Energy/PT MaxPower |
| Project Description | Project Name | Location | Owner | Customer |
| Electrical Work | PLTMG 15 MW – Duri | Duri – Riau | PT PLN Riau/PT MaxPower | PT Navigat Energy/PT MaxPower |
| EPC Mechanical – Electrical | PLTMG 11 MW – Tarakan- Kaltara | Tarakan- Kaltara | PT PLN Tarakan/PT MaxPower | PT Navigat Energy/PT MaxPower |
| Pipe HDPE Installation Dia. 18 | WTP Cap. 20 LPS – Perum Guna Land Bekasi | Bekasi – Jawa Barat | PT Guna Land | PT Guna Land |
| Project Description | Project Name | Location | Owner | Customer |
| EPC Mechanical – Electrical | PLTMG 11 MW – Dompak-Bintan | Bintan – Kepri | PT PLN Batam | PT Navigat Energy/PT MaxPower |
| STP 30 M3 Pasar Cianjur | Proyek Pasar Cianjur – Bogor | Bogor – Jawa Barat | Pemkab Bogor | Pemkab Bogor |
| Electrical Work | Instalasi Diesel Engine – Lebak | Lebak – Banten | PT Chemindo | PT Sewatama |
| Piping | Cooler Diameter 60 Inchi PLTU Palu 2×18 MW | Palu – Sulteng | PT Pusaka Jaya International | PT Pipvalcon |
| EPC Mechanical – Electrical | PLTMG 6,6 MW – Teluk Lamong-Surabaya | Gresik – Jawa Timur | PT Legi | PT Navigat Energy/PT MaxPower |
| Steel Structure | Perumahan Kemang Bangka | Kemang – Jaksel | PT Utama Jaya Tehnik | PT Utama Jaya Tehnik |
| HVAC Work | Shutdown AHU HVAC Building | Jakarta Pusat | KPP Propinsi DKI Jakarta | PT Thermocool Indonesia |
| Project Description | Project Name | Location | Owner | Customer |
| EPC Mechanical – Electrical | Steel Furnaces Cap. 3 TS | Sunter – Jakut | PT Toyota Manufacturing | PT Inductotherm Indonesia |
| EPC Mechanical – Electrical | Steel Furnaces Cap. 300 KG | Batam – Kepri | PT Optimex – Batam | PT Inductotherm Indonesia |
| EPC Steel Structure | Racking Warehouse – Sunter | Sunter – Jakut | PT Navigat Energy | PT Navigat Energy |
| EPC Mechanical – Electrical | Repair SPBU Shell – Fatmawati | Fatmawati – Jakbar | SPBU Shell Fatmawati | PT Sumberdaya Sewatama |
| Electrical Work | Installation Trafo & Cubicle | Jakarta | Pertamina – Simprug | PT Sumberdaya Sewatama |
| Steel Structure | RPTRA Pondok Kopi 1 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi |
| Steel Structure | RPTRA Pondok Kelapa | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi |
| Steel Structure RPTRA | Pondok Kopi 2 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi |
| Mechanical – Electrical Work | Factory Renovation | Malang | Bentoel Group | PT CKD/PT Mitra |
| Electrical Work | Apartemen Regatta | Pluit – Jakut | Regatta | PT Jaya Teknik Indonesia |
| Project Description | Project Name | Location | Owner | Customer |
| Piping Work | WTP Tegal Gede | Cikarang – Jawa Barat | PT Moya | PT Eswareco Tama |
| EPC Civil – Mechanical – Electrical | PLTMG 6.6 MW | Lirik – Riau | PT PLN Batam | PT MaxPower Indonesia |
| Dismantle Gas Engine | Dismantle Gas Engine | Batam – Kepri | PT Tunas Energy | PT MaxPower Indonesia |
| EPC Civil – Mechanical – Electrical | Instalasi Genset 1×1250 kVA | Jakarta Selatan | Citi Bank | PT Global Energitama |
| Mechanical – Electrical Work | Instalasi Genset 1×250 kVA | Sentul – Bogor | STIE Tazkiak | PT Global Energitama |
| Mechanical – Electrical Work Instalasi | Genset 1×500 kVA | Palangkaraya – Kalteng | PT Bisma Darma Kencana | PT Global Energitama |
| Piping Cooling System | PLTU 2X15 MW | Palangkaraya – Kalteng | PT Pusaka Jaya International | PT Pipvalcon |
| Mechanical – Electrical Work | Repair Genset 25 kVA | SPBU Shell – Bandung | SPBU Shell – Bandung | PT Sumberdaya Sewatama |
| Electrical Work | Replacement Cable MV | Jakarta | Pertamina – Pulo Gadung | PT Sumberdaya Sewatama |
| EPC Mechanical – Electrical – Civil | Instalasi Steel Furnace Cap. 3 Ton | Toyota Sunter – Jakarta | Toyota Motor Manufacturing – Sunter | PT Inductotherm |
| Electrical Work | Shutdown & Turn On Furnace | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm |
| Dismantle Gas Engine | Dismantle Gas Engine 4xGE 620, 3.3 MW | Langgam – Riau | PT Langgam Power | PT MaxPower Indonesia |
| Project Description | Project Name | Location | Owner | Customer |
| Electrical Work | Replacement Cable MV & LV Panel | Cilegon | PT Barata Indonesia | PT Barata Indonesia |
| Dismantle Gas Engine | Dismantle Gas Engine MWM 14×1,7 MW | Rawa Minyak – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama |
| Mechanical & Electrical Work | PLTMG Gasib Gas Engine MWM 14×1,7 MW | Gasib – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama |
| Electrical Work | Dismantle & Installation Cubicle | Jakarta | Pertamina Simprug | PT Sumberdaya Sewatama |
| Piping – Storage Tank – Electrical | Water Storage Tank Cap. 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata – Pipvalcon |
| Instrument Work | Water Storage Tank Cap. 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata Indonesia |
| Piping HDPE Work | Water Treatment Work | PLTU Labuan | PLTU Labuan | PT Pipvalcon |
| Civil & Architecture | Renovation | Bekasi | HKBP | HKBP |
| Trainee & Certification | WPS & PQR Splicing Works | PLTU Tanjung Jati | PT BAM Decorient Indonesia | PT BAM Decorient Indonesia |
| Dismantle & Install | Gas Engine PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya |
| Mechanical & Electrical Work | Boiler Cap. 3 TS – Muthu Gading | Solo | PT Muthu Gading | PT Thermax International |
| Mechanical & Electrical Work | PLTD Nanga Tayap 6 MW | Kalimantan Barat | PT PLN Persero | PT Aggreko – KBT |
| Electrical Work | Cleaning Panel – Pertamina Pusat | Jakarta Pusat | PT Pertamina Persero | PT Sumberdaya Sewatama |
| Project Description | Project Name | Location | Owner | Customer |
| Installation HDPE Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi |
| Installation Fuel Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi |
| Rolling & Jacking Engine | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi |
| Fabrication Fuel Tank 5×20 KL | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi |
| Mechanical Work | PLTD Kaimana | Kaimana – Papua | PT PLN Persero | PT Aggreko International |
| Mechanical, Civil & Electrical | PLTD Timika 5 MW | Timika – Papua | PT PLN Persero | PT Aggreko Indonesia |
| Relocation Gas Engine | PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya |
| Mechanical, Civil & Electrical | Installation Gas Engine 2×1000 kVA | Kampar – Riau | PT Pertamina Hulu Energi | KSO Sewatama – MAP |
| Mechanical, Civil & Electrical | Installation Genset 1×400 kV | Daan Mogot – Jakarta | PT Perusahaan Gas Negara | PT Sumberdaya Sewatama |
| Mechanical & Electrical Work | Perbaikan Hidran | Cibitung – Jawa Barat | PT KDS Indonesia | PT KDS Indonesia |
| Installation HDPE Pipe | PLTU 2×1000 Kalteng | Kalteng | PT DSSP | Dongfang Electric |
| Mechanical & Electrical Work | Installation Boiler PT CNG | Cibitung – Jawa Barat | PT CNG | PT Thermax International |
| Container Modification | PLTD Pertamina Sembakung | Kalimantan Barat | PT Pertamina | PT Aggreko – KBT |
| Mechanical & Electrical Work | Installation Water Treatment Plant 15 LPS | Cilacap | PT Dharma Usaha Sukses | PT Thermax International |
| Project Description | Project Name | Location | Owner | Customer |
| Piping Work | Gas Turbine & Boiler | Serpong – Banten | PT Indorama Ventures | PT EuroAsiatic |
| Piping Work | Boiler Cap. 10 TS | Cilengsi – Banten | PT Indorama Ventures | PT EuroAsiatic |
| Mechanical & Electrical Work | PLTD Dobo 3 MW | Dobo – Maluku | PT PLN Persero | PT Aggreko Indonesia |
| Mechanical & Electrical Work | PLTD Saumlaki 2 MW | Saumlaki – Maluku | PT PLN Persero | PT Aggreko Indonesia |
| Repair Chiller | HVAC Work | Jakarta | Cyber Building 2 | Cyber Building 2 |
| Project Description | Project Name | Location | Owner | Customer |
| Reverse Osmosis | Water Treatment Work | Tangerang | PT Kobe | PT Thermax International |
| Mechanical & Electrical Work | Chiller & Genset Work | Cibitung – Jawa Barat | PT XL | PT Aggreko Indonesia |
| Civil & Architecture | Perbaikan Gudang | Cakung | PT Aggreko Indonesia | PT Aggreko Indonesia |
| Civil & Architecture | Perbaikan Hotel | Jakarta | Hotel Sahid Jaya | Hotel Sahid Jaya |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Solo | PT Muthu Gading | PT Thermax International |
| Mechanical & Electrical Work | Install Boiler 1 TpH | Jombang | PT CPI | PT Thermax International |
| Project Description | Project Name | Location | Owner | Customer |
| Piping Work | Chiller & Genset Work | Batam – Kepri | PT McDermott | PT Aggreko Indonesia |
| Civil Work | Mining Facility | Samarinda | PT Kutai Energi | PT Kutai Energi |
| Steel Structure | Boiler 5 TpH | Mentaya | PT Thermax International | |
| Steel Structure | Boiler 3 TpH | Jambi | PT Thermax International | |
| Mechanical & Electrical Work | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International |
| Mechanical & Electrical Work | Dearator & Economizer | Bekasi – Jawa Barat | PT Deheus | PT Thermax International |
| Storage Tank | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International |
| Chimney | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International |
| Mechanical & Electrical Work | Installation Genset 5×1250 kVA | Jakarta | Formula E | PT Aggreko Indonesia |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Cikande | PT Rich Cikande | PT Thermax International |
| Relocation Transformer | Relocation Transformer 100 MVA | PLTU Kupang | PT KarPowership | PT Bertling |
| Fire Fighting & Fire Alarm | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Electrical & Instrument Work | Project Gas Compressor | Denpasar – Bali | PT. PLN Persero | PT Grigora |
| Project Description | Project Name | Location | Owner | Customer |
| Mechanical Work | Recycling Machine Ereme | Tangerang | PT Indorama Ventures Indonesia | PT Indorama Ventures Indonesia |
| Piping Work Conveying | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Mechanical & Electrical Work | Install Boiler 2×6 TpH | Amurang – Sulut | PT Kelapa Jaya Lestari | PT Thermax International |
| Mechanical & Electrical Work | Installation Genset 7×1250 kVA | Sumba – NTT | PT PLN Persero | PT Aggreko Indonesia |
| Assembly & Erection Equipment & Machines IWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Mechanical & Electrical Work | Install Boiler 1×6 TpH | Karawang | PT Indorama Ventures | PT Thermax International |
| Assembly & Erection Equipment RPET Machine Erema | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Piping Work for Conveying Line | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Mechanical & Piping Work | WWTP & MEE | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Assembly & Erection Equipment & Machines IWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures |
| Install Load Bank 14×400 kW | MIG Data Centre | Jakarta | MIG Data Centre | PT Karya Intertek Kencana |
| Project Description | Project Name | Location | Owner | Customer |
| Mechanical Work | Spray Booth Panting Shop | Jakarta | PT Durr System | PT Durr System |
| PLTD Tarakan 9 MW | PLTD Tarakan 9 MW | Tarakan | PT PLN | PT PLN Nusa Daya |
| Project Description | Project Name | Location | Owner | Customer | Year |
| Mechanical Work | Recycling Machine Ereme | Tangerang | PT Indorama Ventures Indonesia | PT Indorama Ventures Indonesia | 2024 |
| Mechanical Work | Spray Booth Panting Shop | Jakarta | PT Durr System | PT Durr System | 2024 |
| PLTD Tarakan 9 MW | PLTD Tarakan 9 MW | Tarakan | PT PLN | PT PLN Nusa Daya | 2024 |
| Piping Work Conveying | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Electrical Work | Install Boiler 2×6 TpH | Amurang – Sulawesi Utara | PT Kelapa Jaya Lestari | PT Thermax International | 2023 |
| Mechanical & Electrical Work | Installation Genset 7×1250 kVA | Sumba – NTT | PT PLN Persero | PT Aggreko Indonesia | 2023 |
| Assembly & Erection Equipment & Machines LWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Electrical Work | Install Boiler 1×6 TpH | Karawang | PT Indorama Ventures | PT Thermax International | 2023 |
| Assembly & Erection Equipment RPET Machine Erema | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Piping Work for Conveying Line | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Mechanical & Piping Work | WWTP & MEE | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Assembly & Erection Equipment & Machines LWL | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2023 |
| Install Load Bank 14×400 kW | MIG Data Centre | Jakarta | MIG Data Centre | PT Karya Intertek Kencana | 2023 |
| Piping Work | Chiller & Genset Work | Batam – Kepulauan Riau | McDermott | PT Aggreko Indonesia | 2022 |
| Mechanical & Electrical Work | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International | 2022 |
| Mechanical & Electrical Work | Dearator & Economizer | Bekasi – Jawa Barat | Deheus | PT Thermax International | 2022 |
| Chimney | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Mechanical & Electrical Work | Installation Genset 5×1250 kVA | Jakarta | Formula E | PT Aggreko Indonesia | 2022 |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Cikande | PT Rich Cikande | PT Thermax International | 2022 |
| Fire Fighting & Fire Alarm | Recycled PET Bottle | Karawang | PT Indorama Ventures | PT Indorama Ventures | 2022 |
| Electrical & Instrument Work | Project Gas Compressor | Denpasar – Bali | PT. PLN Persero | PT Grigora | 2022 |
| Mechanical & Electrical Work | Chiller & Genset Work | Cibitung – Jawa Barat | PT XL | PT Aggreko Indonesia | 2021 |
| Mechanical & Electrical Work | Install Boiler 3 TpH | Solo | PT Muthu Gading | PT Thermax International | 2021 |
| Mechanical & Electrical Work | Install Boiler 1 TpH | Jombang | PT CPI | PT Thermax International | 2021 |
| Piping Work | Gas Turbine & Boiler | Serpong – Banten | PT Indorama Ventures | PT Euroasiatic | 2020 |
| Piping Work | Boiler Cap. 10Ts | Cilengsi – Banten | PT Indorama Ventures | PT Euroasiatic | 2020 |
| Mechanical & Electrical Work | PLTD Dobo 3 MW | Dobo – Maluku | PT PLN Persero | PT Aggreko Indonesia | 2020 |
| Mechanical & Electrical Work | PLTD Saumlaki 2 MW | Saumlaki- Maluku | PT PLN Persero | PT Aggreko Indonesia | 2020 |
| Container Modification | PLTD Pertamina Sembakung | Kalimantan Barat | PT Pertamina Persero | PT Aggreko – KBT | 2019 |
| Mechanical & Electrical Work | Installation Water Treatment Plant 15 lps | Cilacap | PT Dharma Usaha Sukses | PT Thermax International | 2019 |
| Installation HDPE Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Installation Fuel Pipe | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Mechanical Work | PLTD Kaimana | Kaimana – Papua | PT PLN Persero | PT Aggreko International | 2019 |
| Mechanical, Civil & Electrical | PLTD Timika 5 MW | Timika – Papua | PT PLN Persero | PT Aggreko Indonesia | 2019 |
| Mechanical, Civil & Electrical | Installation Gas Engine 2×1000 kVA | Kampar – Riau | PT Pertamina Hulu Energi | KSO Sewatama – MAP | 2019 |
| Mechanical, Civil & Electrical | Installation Genset 1×400 kV | Daanmogot – Jakarta | PT Perusahaan Gas Negara | PT Sumberdaya Sewatama | 2019 |
| Mechanical & Electrical Work | Perbaikan Hydrant | Cibitung – Jawa Barat | PT KDS Indonesia | PT KDS Indonesia | 2019 |
| Installation HDPE Pipe | PLTU 2×1000 Kalimantan Tengah | Kalimantan Tengah | PT DSSP | Dongfang Electric | 2019 |
| Mechanical & Electrical Work | Installation Boiler PT CNG | Cibitung – Jawa Barat | PT CNG | PT Thermax International | 2019 |
| Electrical Work | Replacemet Cable MV & LV Panel | Cilegon | PT Barata Indonesia | PT Barata Indonesia | 2018 |
| Mechanical – Electrical Work | PLTMG Gasib Gas Engine MWm 14×1,7 MW | Gasib – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama | 2018 |
| Electrical Work | Dismantle & Installation Cubicle | Jakarta | Pertamina – Simprug | PT Sumberdaya Sewatama | 2018 |
| Piping – Storage Tank – Electrical | Water Storage Tank Cap. 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata – Pipvalcon | 2018 |
| Instrument Work | Water Storage Tank Cap. 1500 kL | Pelabuhan Ratu | PLTU Pelabuhan Ratu | PT Barata Indonesia | 2018 |
| Piping HDPE Work | Water Treatment Work | PLTU Labuan | PLTU Labuan | PT Pipvalcon | 2018 |
| Trainee & Certification | WPS & PQR Splicing Works | PLTU Tanjung Jati | PT Bam Decorient Indonesia | PT Bam Decorient Indonesia | 2018 |
| Mechanical & Electrical Work | Boiler Cap. 3 Ts – Muthu Gading | Solo | PT Muthu Gading | PT Thermax International | 2018 |
| Mechanical & Electrical Work | PLTD Nanga Tayap 6 MW | Kalimantan Barat | PT PLN Persero | PT Aggreko – KBT | 2018 |
| Electrical Work | Cleaning Panel – Pertamina Pusat | Jakarta Pusat | PT Pertamina Persero | PT Sumberdaya Sewatama | 2018 |
| Piping Work | WTP Tegal Gede | Cikarang – Jawa Barat | PT Moya | PT Eswareco Tama | 2017 |
| EPC Civil – Mechanical – Electrical | PLTMG 6.6 MW | Lirik – Riau | PT PLN Persero Batam | PT MaxPower Indonesia | 2017 |
| EPC Civil – Mechanical – Electrical | Instalasi Genset 1×1250 kVA | Jakarta Selatan | Citibank | PT Global Energitama | 2017 |
| Mechanical – Electrical Work | Instalasi Genset 1×250 kVA | Sentul – Bogor | STIE Tazkia | PT Global Energitama | 2017 |
| Mechanical – Electrical Work | Instalasi Genset 1×500 kVA | Palangkaraya – Kalimantan Tengah | PT Bisma Darma Kencana | PT Global Energitama | 2017 |
| Piping Cooling System | PLTU 2×15 MW | Palangkaraya – Kalimantan Tengah | PT Pusaka Jaya International | PT Pipvalcon | 2017 |
| Mechanical – Electrical Work | Repair Genset 25 kVA | SPBU Shell – Bandung | SPBU Shell – Bandung | PT Sumberdaya Sewatama | 2017 |
| Electrical Work | Replacemet Cable MV | Jakarta | Pertamina – Pulo Gadung | PT Sumberdaya Sewatama | 2017 |
| EPC Mechanical – Electrical – Civil | Instalasi Steel Furnace Cap. 3 Ton | Toyota Sunter – Jakarta | Toyota Motor Manufacturing – Sunter | PT Inductotherm | 2017 |
| Electrical Work | Shutdown & Turn On Furnace | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm | 2017 |
| EPC Mechanical – Electrical | Steel Furnaces Cap. 3 Ts | Sunter – Jakarta Utara | PT Toyota Manufacturing | PT Inductotherm Indonesia | 2016 |
| EPC Mechanical – Electrical | Steel Furnaces Cap. 300 Kg | Batam – Kepulauan Riau | PT Optimex – Batam | PT Inductotherm Indonesia | 2016 |
| EPC Mechanical – Electrical | Repair SPBU Shell – Fatmawati | Fatmawati – Jakarta Barat | SPBU Shell Fatmawati | PT Sumberdaya Sewatama | 2016 |
| Electrical Work | Installation Trafo & Cubicle | Jakarta | Pertamina – Simprug | PT Sumberdaya Sewatama | 2016 |
| Mechanical – Electrical Work | Factory Renovation | Malang | Bentoel Group | PT CKD/PT Mitra | 2016 |
| Electrical Work | Apartemen Regatta | Pluit – Jakarta Utara | Regatta | PT Jaya Teknik Indonesia | 2016 |
| EPC Mechanical – Electrical | PLTMG 11 MW -Dompak-Bintan | Bintan – Kepulauan Riau | PT PLN Persero Batam | PT Navigat Energy/PT MaxPower | 2015 |
| Electrical Work | Instalasi Diesel Engine – Lebak | Lebak – Banten | PT Chemindo | PT Sewatama | 2015 |
| Piping Cooler Dia. 60″ | PLTU Palu 2×18 MW | Palu – Sulawesi Tenggara | PT Pusaka Jaya International | PT Pipvalcon | 2015 |
| EPC Mechanical – Electrical | PLTMG 6,6 MW -Teluk Lamong-Surabaya | Gresik – Jawa Timur | PT Legi | PT Navigat Energy/PT MaxPower | 2015 |
| HVAC Work | Shutdown AHU HVAC Building | Jakarta Pusat | KPP Propinsi DKI Jakarta | PT Thermocool Indonesia | 2015 |
| Electrical Work | PLTMG 15 MW -Duri | Duri – Riau | PT PLN Persero Riau/PT MaxPower | PT Navigat Energy/PT MaxPower | 2014 |
| EPC Mechanical – Electrical | PLTMG 11 MW – Tarakan-Kalimantan Utara | Tarakan – Kalimantan Utara | PT PLN Persero Tarakan/PT MaxPower | PT Navigat Energy/PT MaxPower | 2014 |
| Pipe HDPE Installation Dia. 18“ | WTP Cap. 20 lps – Perum Guna Land Bekasi | Bekasi – Jawa Barat | PT Guna Land | PT Guna Land | 2014 |
| Instalasi Tangki & Perbaikan Pipa | Pengembangan Instalasi Air Gedung | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan | 2013 |
| Fume Hood Installation | Steel Furnaces Modification | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia | 2013 |
| Plumbing Works | Apartemen Pulo Mas | Jakarta Timur | PT Duta Anggada | PT Nusa Raya Cipta | 2013 |
| EPC Mechanical – Electrical | Bio Gas Power Plant 1 MW – Asian Agri | Ukui – Riau | PT Asian Agri | PT Navigat Energy/PT MaxPower | 2013 |
| Mechanical – Electrical | Steel Furnaces Cap. 5 Ts/Day | Cikarang – Jawa Barat | PT Yanmar Casting Indonesia | PT Inductotherm Indonesia | 2012 |
| Hydrant & Electrical Factory | Factory Renovation | Cikarang – Jawa Barat | PT Mitsubishi Electric | PT Zafitech | 2012 |
| Welding Pipe Cooler Dia. 32″ | Bukit Asam | Cileungsi – Jawa Barat | PT Bukit Asam | PT Karya Maju | 2012 |
| Electrical & Mechanical Work | Building Renovation | Grogol – Jakarta Barat | Kementerian Perdagangan | BPPEI – Departemen Perdagangan | 2012 |
| Piping LPG & Hydrant SPBE Jatiranggon | SPBE Jatiranggon Cap. 50 Ts/Day | Bekasi – Jawa Barat | PT Indika Energy Tbk. | PT Hans Jaya Utama | 2011 |
| Cirebon CFPP 660 MW Plumbing Works | PLTU Cirebon 66O MW – Plumbing Works | Cirebon – Jawa Barat | PT Cirebon Electric Power | PT Hans Jaya Utama | 2011 |
| Project Description | Project Name | Location | Owner | Customer | Year |
| Civil Work | Mining Facility | Samarinda | PT Kutai Energi | PT Kutai Energi | 2022 |
| Steel Structure | Boiler 5 TpH | Mentaya | PT Thermax International | 2022 | |
| Steel Structure | Boiler 3 TpH | Jambi | PT Thermax International | 2022 | |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Steel Structure | Boiler 5 TpH | Bojonegoro | PT CPI | PT Thermax International | 2022 |
| Civil & Architecture | Perbaikan Gudang | Cakung | PT Aggreko Indonesia | PT Aggreko Indonesia | 2021 |
| Civil & Architecture | Perbaikan Hotel | Jakarta | Hotel Sahid Jaya | Hotel Sahid Jaya | 2021 |
| Civil & Architecture | Renovation | Bekasi | HKBP | HKBP | 2018 |
| EPC Steel Structure | Racking Ware House – Sunter | Sunter – Jakarta Utara | PT Navigat Energy | PT Navigat Energy | 2016 |
| Steel Structure | RPTRA Pondok Kopi 1 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Steel Structure | RPTRA Pondok Kelapa | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Steel Structure | RPTRA Pondok Kopi 2 | Jakarta Timur | Pemda DKI Jakarta | PT Jaya Konstruksi | 2016 |
| Steel Structure | Perumahan Kemang Bangka | Kemang – Jakarta Selatan | PT Utama Jaya Tehnik | PT Utama Jaya Tehnik | 2015 |
| Steel Structure | Rumah Dinas PLN – Pd. Indah | Pondok Indah – Jakarta Selatan | PT PLN Persero | PT Swasti | 2012 |
| Rehabilitasi Gedung Kantor | Building Renovation | Tj. Priok – Jakarta Utara | KPP Pratama – Tj. Priok | KPP Pratama – Tj. Priok | 2012 |
| Project Description | Project Name | Location | Owner | Customer | Year |
| Reverse Osmosis | Water Treatment Work | Tangerang | PT Kobe | PT Thermax International | 2021 |
| STP 30 m3 Pasar Cianjur | Proyek Pasar Cianjur – Bogor | Bogor – Jawa Barat | Pemkab Bogor | Pemkab Bogor | 2015 |
| WTP Citra Gran – Cibubur | WTP Citra Gran | Bogor – Jawa Barat | Perum Citra Gran – Cibubur | PT Parindo | 2013 |
| Tangki Filter St. Morits – Jakarta Barat | WTP St. Morits – Kembangan | Kebon Jeruk – Jakarta Barat | PT Tata | PT Eswareco Tama | 2013 |
| WTP Jungle Land – Sentul | WTP Jungle Land Cap. 25 lps | Bogor – Jawa Barat | PT Jungle Land Asia | PT Adhi Karya, Tbk. | 2012 |
| Reservoar FRP Cap. 200 m3 | WTP Jungle Land Cap. 25 lps | Bogor – Jawa Barat | PT Sumber Tirta | PT Sumber Tirta | 2012 |
| Project IPA – Kalimatan Barat | WTP Project Cap. 10 lps | Singkawang – Kalimantan Barat | Kementerian Pekerjaan Umum | PT Artha Envirotama | 2011 |
| Project Description | Project Name | Location | Owner | Customer | Year |
| Storage Tank | Install Boiler 4 TpH | Bandung | PT Alfa Polimer | PT Thermax International | 2022 |
| Repair Chiller | HVAC Work | Jakarta | Cyber Bulding 2 | Cyber Bulding 2 | 2020 |
| Fabrication Fuel Tank 5×20 kL | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Project Description | Project Name | Location | Owner | Customer | Year |
| Relocation Transformer | Relocation Transformer 100 MVA | PLTU Kupang | PT Karpowership | PT Bertling | 2022 |
| Rolling & Jacking Engine | International Terminal Container | Belawan | PT Pelindo Persero | PT Wijaya Rekayasa Konstruksi | 2019 |
| Relocation Gas Engine | PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya | 2019 |
| Dismantle Gas Engine | Dismantle Gas Engine MWm 14×1,7 MW | Rawa Minyak – Riau | PT Wijaya Karya | PT Sumberdaya Sewatama | 2018 |
| Dismantle & Install Gas Engine | PLTMG Rengat 20 MW | Rengat – Riau | PT Wijaya Karya | PT Wijaya Karya | 2018 |
| Dismantle Gas Engine | Dismantle Gas Engine | Batam – Kepulauan Riau | PT Tunas Energy | PT MaxPower Indonesia | 2017 |
| Dismantle Gas Engine | Dismantle Gas Engine 4 x Ge 620, 3.3 MW | Langgam – Riau | PT Langgam Power | PT MaxPower Indonesia | 2017 |